Request a phone call
Request a phone call
Request a phone call
We will call you back

Anfrage wird gesendet...






Write an e-mail
Write an e-mail
Write an e-mail
We will send you a reply

Anfrage wird gesendet...






Arrange a meeting
Arrange a meeting
Arrange a meeting
We look forward to meeting you

Anfrage wird gesendet...






   
Sie möchten mit uns persönlich
sprechen? Dann rufen Sie uns einfach an.
Fon + 49 3671 5721 0
zurück
weiter

Tunnel building

While the tunnel is still under construction, fine cleaning of the tunnel floor is possible with the HydroCleaner accessory. At a speed of 4 km/h, the tunnel floor is rid of concrete remains, water, sludge and loose rubble in one operation.

zurück
weiter

Tunnel building

While the tunnel is still under construction, fine cleaning of the tunnel floor is possible with the HydroCleaner accessory. At a speed of 4 km/h, the tunnel floor is rid of concrete remains, water, sludge and loose rubble in one operation.

zurück
weiter

Retrofitting of safety equipment

In many tunnels, safety equipment has to be fitted retrospectively in order to comply with statutory regulations. The cables which have been laid in the individual ducts must be exposed to enable this work to be carried out. For fire-prevention reasons, these ducts are filled with sand. The material is sucked out and transported to the storage area in a short time and without the risk of damaging the power and communications cables. On completion of the work, it can be reused.

Contacts
Christian Graber
Area Sales Manager North America
Fon +49 3671 5721 221
Fax +49 3671 5721 29
cg@rsp-germany.com